Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 10 results ...

Chua, D K and Godinot, M (2006) Use of a WBS Matrix to Improve Interface Management in Projects. Journal of Construction Engineering and Management, 132(01), 67–79.

Fan, S and Tserng, H P (2006) Object-Oriented Scheduling for Repetitive Projects with Soft Logics. Journal of Construction Engineering and Management, 132(01), 35–48.

  • Type: Journal Article
  • Keywords: Scheduling; Computer aided scheduling; Computer applications; Construction management;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(2006)132:1(35)
  • Abstract:
    The application of network techniques of project scheduling to repetitive projects has been criticized for the inability of network techniques to help maintain work continuity. Moreover, current network techniques require a large number of activities to represent a repetitive project and presume that there is only one logical sequence. This makes schedules time consuming to develop as well as maintain. Further, the logic chosen by the planner might be far from the shortest possible duration. This paper, utilizing the soft logic sequencing principles developed by Fan et al., develops a system which provides an easy input module in addition to scheduling and work-continuity-maintenance modules. The system eases the network generation and update processes, which in turn provides the shortest possible duration logics and the start and finish dates required to maintain work continuity.

Hegazy, T (2006) Computerized System for Efficient Delivery of Infrastructure Maintenance/Repair Programs. Journal of Construction Engineering and Management, 132(01), 26–34.

Lee, D and Arditi, D (2006) Total Quality Performance of Design/Build Firms Using Quality Function Deployment. Journal of Construction Engineering and Management, 132(01), 49–57.

Lee, D and Shi, J J (2006) Construction Business Automation System. Journal of Construction Engineering and Management, 132(01), 88–96.

Nitithamyong, P and Skibniewski, M J (2006) Success/Failure Factors and Performance Measures of Web-Based Construction Project Management Systems: Professionals’ Viewpoint. Journal of Construction Engineering and Management, 132(01), 80–87.

Oyetunji, A A and Anderson, S D (2006) Relative Effectiveness of Project Delivery and Contract Strategies. Journal of Construction Engineering and Management, 132(01), 3–13.

Randolph Thomas, H and Horman, M J (2006) Fundamental Principles of Workforce Management. Journal of Construction Engineering and Management, 132(01), 97–104.

Vanhoucke, M (2006) Work Continuity Constraints in Project Scheduling. Journal of Construction Engineering and Management, 132(01), 14–25.

Yang, M, Chen, S and Chen, S (2006) Innovative Central Opening Strut System for Foundation Excavation. Journal of Construction Engineering and Management, 132(01), 58–66.